How to start a hardwood flooring install job and one lucky day for a carpenter

This video covers how to begin a hardwood flooring installation job. It shows the importance of a control line in order to follow the old carpenters rule of …


Additional Information

    5 Responses to “How to start a hardwood flooring install job and one lucky day for a carpenter”

    • warlok9:

      Putting in a naildown 3/4″ now that has some enclosed areas where I would
      need to work backwards from my center line, very much like the area you
      left unfinished around that entry wall adjacent to the front door. I wanted
      to see how you installed that area working backwards and how you nailed it
      in.

    • James Herman:

      US TOO!!!!!!!

    • Dick Fotoples:

      How do you snap that first line?

    • Dwayne:

      Very lucky breaks with those boards at the closet & walls. Since I’ve left
      my compound miter saw in town on a job I’m counting on this floor I’m doing
      today to break in the middle of every darn board possible. Thanks for a
      good video – it’s been a while since I’ve done a floor & the review helps.

    • John Giglio:

      Audio is awful, I was really looking forward to learn something!

    Leave a Reply